I 93 over HWY WEST ST
0.96 KM NLY RT 128 · County 017, Massachusetts · Built 1959 · 8 Lanes · 158,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.509003, -71.123556
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 67 years old.
Nearby Bridges
HWY WASHNGTON ST over I 95 /ST128
Built 1961
I 93 over I 95 /ST128
Built 1957
HWY MISHAWUM RD over RR MBTA/BMRR
Built 1977
I 95 /ST128 over RR MBTA/BMRR
Built 1950
I 93 OFF RAMP over I 93 & NB ON RAMP
Built 2000
HWY OLYMPIA AVE over RR MBTA/BMRR
Built 1963
I 93 NB ON RAMP over I 93
Built 2000
HWY MISHAWUM RD over I 95 /ST128
Built 1961
I 95 /ST128 over ST 28 MAIN ST
Built 1950
HWY MINERAL ST over RR MBTA/BMRR
Built 1997
Bridge Details
- Structure #
- R030102HLDOTNBI
- Year Built
- 1959
- Reconstructed
- 1985
- Length
- 48.2 m (158.1 ft)
- Max Span
- 20.6 m
- Width
- 47.2 m (154.9 ft)
- Lanes
- 8
- Daily Traffic
- 158,200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $15,015,000
- Total Project Cost
- $22,523,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.