I 93 OFF RAMP over I 93 & NB ON RAMP

COMMERCE WAY · County 017, Massachusetts · Built 2000 · 1 Lanes · 2,389 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W43048AGBDOTNBI
Year Built
2000
Length
488.8 m (1603.7 ft)
Max Span
48.7 m
Width
7.8 m (25.6 ft)
Lanes
1
Daily Traffic
2,389
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,143,000
Total Project Cost
$13,715,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.