HWY WEST ST over I 93
0.25 MI S RT 129 · County 017, Massachusetts · Built 1957 · 2 Lanes · 6,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.533278, -71.135619
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
ST129 LOWELL ST over I 93
Built 1957
ST129 LOWELL ST over RR MBTA/BMRR
Built 1958
I 93 NB over RR MBTA/BMRR
Built 1958
I 93 SB over RR MBTA/BMRR
Built 1958
I 93 NB ON RAMP over I 93
Built 2000
I 93 OFF RAMP over I 93 & NB ON RAMP
Built 2000
HWY EAMES ST over RR MBTA/BMRR
Built 1994
HWY MINERAL ST over RR MBTA/BMRR
Built 1997
ST 38 MAIN ST over RR MBTA/BMRR
Built 1928
ST129 LOWELL ST over WATER MAPLE MEADOW BROOK
Built 2008
Bridge Details
- Structure #
- W380302MBDOTNBI
- Year Built
- 1957
- Reconstructed
- 1994
- Length
- 90.2 m (295.9 ft)
- Max Span
- 33.5 m
- Width
- 15.1 m (49.5 ft)
- Lanes
- 2
- Daily Traffic
- 6,300
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,921,000
- Total Project Cost
- $13,382,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.