I 93 NB over RR MBTA/BMRR

.6 KM NLY RT 129 · County 017, Massachusetts · Built 1958 · 5 Lanes · 57,950 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W380282HRDOTNBI
Year Built
1958
Reconstructed
1972
Length
29 m (95.1 ft)
Max Span
26.8 m
Width
22.6 m (74.1 ft)
Lanes
5
Daily Traffic
57,950
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,402,000
Total Project Cost
$6,604,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.