I 93 SB over RR MBTA/BMRR

0.4 MI NLY RT 129 · County 017, Massachusetts · Built 1958 · 4 Lanes · 87,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W380282HTDOTNBI
Year Built
1958
Reconstructed
1972
Length
28 m (91.9 ft)
Max Span
26.5 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
87,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,255,000
Total Project Cost
$6,383,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.