ST 38 MAIN ST over RR MBTA/BMRR

.75 MI S OF ST-129 · County 017, Massachusetts · Built 1928 · 2 Lanes · 12,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
4
Poor
Superstructure
3
Serious
Substructure
3
Serious

Bridge Details

Structure #
W380022NQDOT634
Year Built
1928
Length
29.6 m (97.1 ft)
Max Span
16.8 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
12,500
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,577,000
Total Project Cost
$9,866,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.