ST 62 BURLNGTN AVE over RR MBTA/BMRR

AT RT 38 · County 017, Massachusetts · Built 2000 · 4 Lanes · 19,530 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W380042NUDOT634
Year Built
2000
Length
40.4 m (132.5 ft)
Max Span
18.1 m
Width
19.7 m (64.6 ft)
Lanes
4
Daily Traffic
19,530
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,408,000
Total Project Cost
$6,613,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.