HWY LAKE ST over RR MBTA/BMRR
0.3 MI NE OF ST-129 · County 017, Massachusetts · Built 1986 · 2 Lanes · 4,790 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.564408, -71.199811
This bridge is in worse condition than 25.6% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 40 years old.
Nearby Bridges
HWY NICHOLS ST over RR MBTA/BMRR
Built 1968
ST129 SALEM RD over WATER SHAWSHEEN RIVER
Built 1932
ST129 RICHMOND RD over WATER MIDDLESEX CANAL
Built 1974
ST129 RICHMOND RD over RR MBTA/BMRR
Built 1973
HWY GEO BROWN ST over RR MBTA/BMRR
Built 2005
ST 38 MAIN ST over WATER SHAWSHEEN RIVER
Built 1997
ST 62 BURLNGTN AVE over RR MBTA/BMRR
Built 2000
HWY ANDOVER RD over RR MBTA/BMRR
Built 2006
HWY BRIDGE ST over WATER SHAWSHEEN RIVER
Built 1979
ST 62 MIDDLESEX AV over WATER LUBBERS BROOK
Built 2022
Bridge Details
- Structure #
- W380072NTDOT634
- Year Built
- 1986
- Length
- 18.9 m (62 ft)
- Max Span
- 17.1 m
- Width
- 11.2 m (36.7 ft)
- Lanes
- 2
- Daily Traffic
- 4,790
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,451,000
- Total Project Cost
- $2,177,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.