ST 62 MIDDLESEX AV over WATER LUBBERS BROOK

225FT W OF NORTH STREET · County 017, Massachusetts · Built 2022 · 2 Lanes · 26,800 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
W38019CANMUNNBI
Year Built
2022
Length
12.6 m (41.3 ft)
Max Span
7.7 m
Width
28.1 m (92.2 ft)
Lanes
2
Daily Traffic
26,800
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.