ST125 BALLRDVLE ST over I 93
RT 125 AT RT 93 · County 017, Massachusetts · Built 1958 · 2 Lanes · 23,700 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.584097, -71.157708
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 68 years old.
Nearby Bridges
ST 62 MIDDLESEX AV over I 93
Built 1958
I 93 SB over RR MBTA/BMRR
Built 1959
I 93 NB over RR MBTA/BMRR
Built 1959
ST 62 MIDDLESEX AV over WATER LUBBERS BROOK
Built 2022
HWY WOBURN ST over I 93
Built 1958
I 93 over HWY CONCORD ST
Built 1958
HWY BRIDGE ST over WATER SHAWSHEEN RIVER
Built 1979
HWY MILL ST over WATER SHAWSHEEN RIVER
Built 1998
ST 38 MAIN ST over WATER SHAWSHEEN RIVER
Built 1997
HWY WOBURN ST over WATER IPSWICH RIVER
Built 1980
Bridge Details
- Structure #
- W380342E8DOTNBI
- Year Built
- 1958
- Length
- 97.5 m (319.9 ft)
- Max Span
- 36 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 23,700
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,671,000
- Total Project Cost
- $14,507,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.