HWY MILL ST over WATER SHAWSHEEN RIVER

1 MI. N. OF RT. 38 · County 017, Massachusetts · Built 1998 · 2 Lanes · 170 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
T030032D5MUNNBI
Year Built
1998
Length
14.9 m (48.9 ft)
Max Span
3.7 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
170
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$465,000
Total Project Cost
$698,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.