I 93 NB over HWY VALE ST

0.1 MI SLY ANDOVER T.L. · County 017, Massachusetts · Built 1958 · 3 Lanes · 145,580 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
T030102HPDOTNBI
Year Built
1958
Reconstructed
1975
Length
13.7 m (44.9 ft)
Max Span
12.5 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
145,580
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,527,000
Total Project Cost
$2,291,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.