I 93 NB over RR MBTA/BMRR

0.8 MI N OF ST-125 · County 017, Massachusetts · Built 1959 · 4 Lanes · 73,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W380362HXDOTNBI
Year Built
1959
Length
23.2 m (76.1 ft)
Max Span
21.9 m
Width
21.1 m (69.2 ft)
Lanes
4
Daily Traffic
73,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,827,000
Total Project Cost
$5,741,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.