I 93 NB over RR BMRR

0.25 MI S RT 93 & VALE ST · County 009, Massachusetts · Built 1959 · 3 Lanes · 73,318 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
A090242J6DOTNBI
Year Built
1959
Reconstructed
1972
Length
42.4 m (139.1 ft)
Max Span
14 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
73,318
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,963,000
Total Project Cost
$8,945,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.