HWY GEO BROWN ST over RR MBTA/BMRR

.16 KM NE SALEM & BROWN · County 017, Massachusetts · Built 2005 · 2 Lanes · 2,252 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B12014AF7DOT634
Year Built
2005
Length
16.3 m (53.5 ft)
Max Span
15.2 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
2,252
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,775,000
Total Project Cost
$2,663,000