HWY GRAY ST over RR MBTA/BMRR

.4 MILES TWKS. TWN. LINE · County 017, Massachusetts · Built 1996 · 2 Lanes · 4,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B120122MVDOT634
Year Built
1996
Length
38.1 m (125 ft)
Max Span
15.8 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
4,300
Material
Prestressed Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,707,000
Total Project Cost
$5,561,000