HWY SALEM ST over I 93

0.7 MI S RTE 128 · County 017, Massachusetts · Built 1957 · 2 Lanes · 15,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W430352MEDOTNBI
Year Built
1957
Length
71.6 m (234.9 ft)
Max Span
34.7 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
15,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,059,000
Total Project Cost
$10,589,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.