I 93 over RR BMRR SPUR (ABAND)

STONEHAM-WOBURN TOWN LINE · County 017, Massachusetts · Built 1958 · 8 Lanes · 189,880 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S270042HMDOTNBI
Year Built
1958
Reconstructed
1971
Length
8.7 m (28.5 ft)
Max Span
8.1 m
Width
49.7 m (163.1 ft)
Lanes
8
Daily Traffic
189,880
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,904,000
Total Project Cost
$4,357,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.