HWY MARBLE ST over I 93

0.88 KM SLY MONTVALE AVE · County 017, Massachusetts · Built 1958 · 2 Lanes · 25,335 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S270082M5DOTNBI
Year Built
1958
Length
56.1 m (184.1 ft)
Max Span
26.8 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
25,335
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,217,000
Total Project Cost
$9,326,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.