HWY WASHNGTON ST over WATER ABERJONA RIVER
.48 KM S. OF WOBURN · County 017, Massachusetts · Built 1934 · 2 Lanes · 30,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.469481, -71.125033
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 92 years old.
Nearby Bridges
HWY MONTVALE AVE over RR MBTA/BMRR
Built 1987
HWY MONTVALE AVE over WATER ABERJONA RIVER
Built 1958
HWY MARBLE ST over I 93
Built 1958
I 93 over RR BMRR SPUR (ABAND)
Built 1958
I 93 SB ON RAMP over OTHER TRI COMMUNITY GREE
Built 1958
I 93 over OTHER TRI COMMUNITY GREE
Built 1958
HWY SWANTON ST over WATER ABERJONA RIVER
Built 2021
I 93 NB OFF RMP over OTHER TRI COMMUNITY GREE
Built 1958
I 93 over HWY MONTVALE AVE
Built 1958
I 93 over HWY FALLON ROAD
Built 1958
Bridge Details
- Structure #
- W400122CHMUNNBI
- Year Built
- 1934
- Length
- 7.6 m (24.9 ft)
- Max Span
- 6.4 m
- Width
- 16.1 m (52.8 ft)
- Lanes
- 2
- Daily Traffic
- 30,000
- Material
- Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $837,000
- Total Project Cost
- $1,256,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.