I 93 over HWY FALLON ROAD
1.4 KM SLY MONTVALE AVE · County 017, Massachusetts · Built 1958 · 8 Lanes · 176,618 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.469347, -71.107367
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 68 years old.
Nearby Bridges
HWY MARBLE ST over I 93
Built 1958
I 93 over RR BMRR SPUR (ABAND)
Built 1958
I 93 NB OFF RMP over OTHER TRI COMMUNITY GREE
Built 1958
I 93 over OTHER TRI COMMUNITY GREE
Built 1958
I 93 SB ON RAMP over OTHER TRI COMMUNITY GREE
Built 1958
ST 28 FELLSWAY W over I 93
Built 1959
I 93 over HWY MONTVALE AVE
Built 1958
HWY MONTVALE AVE over WATER ABERJONA RIVER
Built 1958
HWY WASHNGTON ST over WATER ABERJONA RIVER
Built 1934
HWY MONTVALE AVE over RR MBTA/BMRR
Built 1987
Bridge Details
- Structure #
- S270072HNDOTNBI
- Year Built
- 1958
- Reconstructed
- 1972
- Length
- 38 m (124.7 ft)
- Max Span
- 17.4 m
- Width
- 50.6 m (166 ft)
- Lanes
- 8
- Daily Traffic
- 176,618
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $12,812,000
- Total Project Cost
- $19,219,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.