ST 28 FELLSWAY W over I 93

RT 28 AT RT 93 · County 017, Massachusetts · Built 1959 · 2 Lanes · 9,181 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
3
Serious
Substructure
5
Fair

Bridge Details

Structure #
S270062L2DOTNBI
Year Built
1959
Reconstructed
1976
Length
122.8 m (402.9 ft)
Max Span
43 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
9,181
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,617,000
Total Project Cost
$18,926,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.