I 93 NB over ST 28 FELLSWAY WST

1KM S OF EXIT 34 · County 017, Massachusetts · Built 1959 · 4 Lanes · 93,010 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M120352HHDOTNBI
Year Built
1959
Length
27.1 m (88.9 ft)
Max Span
24.4 m
Width
25.1 m (82.3 ft)
Lanes
4
Daily Traffic
93,010
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,190,000
Total Project Cost
$3,286,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.