ST 38 MAIN ST over WATER ABERJONA RIVER

.16 KM. E. OF RT. 38 · County 017, Massachusetts · Built 1915 · 2 Lanes · 10,732 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W400042DAMUNNBI
Year Built
1915
Length
10.7 m (35.1 ft)
Max Span
10.7 m
Width
22.3 m (73.2 ft)
Lanes
2
Daily Traffic
10,732
Material
Concrete
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$319,000
Total Project Cost
$479,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.