HWY LAKE ST over WATER HORN POND BROOK

0.4 KM W OF MAIN ST · County 017, Massachusetts · Built 2024 · 2 Lanes · 9,500 vehicles/day

Overall
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
W40006CARMUNNBI
Year Built
2024
Length
7.9 m (25.9 ft)
Max Span
7.9 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
9,500
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.