HWY HRN PD BK RD over WATER HORN POND BROOK
AT ENT LYNCH JR. H.SCHOOL · County 017, Massachusetts · Built 1960 · 2 Lanes · 388 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.461564, -71.149406
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 66 years old.
Nearby Bridges
HWY SKILLINGS RD over WATER ABERJONA RIVER
Built 1955
HWY LAKE ST over WATER HORN POND BROOK
Built 2024
HWY SWANTON ST over WATER ABERJONA RIVER
Built 2021
HWY MAIN ST over WATER WEDGE POND OTLT
Built 1935
HWY SHORE RD over WATER ABERJONA RIVER
Built 1955
HWY MT VERNON ST over WATER ABERJONA RIVER
Built 1890
ST 38 MAIN ST over WATER ABERJONA RIVER
Built 1915
HWY WATERFLD RD over WATER ABERJONA RIVER
Built 1915
HWY BACON ST over WATER ABERJONA RIVER
Built 1920
HWY MYST VAL PKY over WATER ABERJONA RIVER
Built 1896
Bridge Details
- Structure #
- W400312D9MUNNBI
- Year Built
- 1960
- Reconstructed
- 2016
- Length
- 9.4 m (30.8 ft)
- Max Span
- 8.8 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 388
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $637,000
- Total Project Cost
- $956,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.