HWY SKILLINGS RD over WATER ABERJONA RIVER
1.4 KM W STONEHAM · County 017, Massachusetts · Built 1955 · 2 Lanes · 11,800 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
42.456864, -71.138928
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 71 years old.
Nearby Bridges
HWY LAKE ST over WATER HORN POND BROOK
Built 2024
HWY MAIN ST over WATER WEDGE POND OTLT
Built 1935
HWY SHORE RD over WATER ABERJONA RIVER
Built 1955
HWY SWANTON ST over WATER ABERJONA RIVER
Built 2021
HWY MT VERNON ST over WATER ABERJONA RIVER
Built 1890
ST 38 MAIN ST over WATER ABERJONA RIVER
Built 1915
HWY WATERFLD RD over WATER ABERJONA RIVER
Built 1915
HWY HRN PD BK RD over WATER HORN POND BROOK
Built 1960
HWY BACON ST over WATER ABERJONA RIVER
Built 1920
HWY MYST VAL PKY over WATER ABERJONA RIVER
Built 1896
Bridge Details
- Structure #
- W400272CKMUNNBI
- Year Built
- 1955
- Length
- 12.7 m (41.7 ft)
- Max Span
- 6.1 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 2
- Daily Traffic
- 11,800
- Material
- Concrete
- Design
- Culvert
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,137,000
- Total Project Cost
- $1,706,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.