I 93 SB over ST 28 FELLSWAY WST

RT 93 AT RT 28 · County 017, Massachusetts · Built 1959 · 4 Lanes · 84,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
M120352HJDOTNBI
Year Built
1959
Length
27.1 m (88.9 ft)
Max Span
24.4 m
Width
25 m (82 ft)
Lanes
4
Daily Traffic
84,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,545,000
Total Project Cost
$6,818,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.