HWY MONTVALE AVE over RR MBTA/BMRR
0.75 MI W OF I-93 · County 017, Massachusetts · Built 1987 · 2 Lanes · 30,800 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.48035, -71.126803
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 39 years old.
Nearby Bridges
HWY MONTVALE AVE over WATER ABERJONA RIVER
Built 1958
I 93 over HWY MONTVALE AVE
Built 1958
I 93 SB ON RAMP over OTHER TRI COMMUNITY GREE
Built 1958
I 93 over OTHER TRI COMMUNITY GREE
Built 1958
HWY SALEM ST over RR MBTA/BMRR
Built 2021
I 93 NB OFF RMP over OTHER TRI COMMUNITY GREE
Built 1958
HWY WASHNGTON ST over WATER ABERJONA RIVER
Built 1934
I 93 over RR BMRR SPUR (ABAND)
Built 1958
HWY SALEM ST over I 93
Built 1957
HWY MARBLE ST over I 93
Built 1958
Bridge Details
- Structure #
- W430022P0DOT634
- Year Built
- 1987
- Length
- 19.5 m (64 ft)
- Max Span
- 17.1 m
- Width
- 16.7 m (54.8 ft)
- Lanes
- 2
- Daily Traffic
- 30,800
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,169,000
- Total Project Cost
- $3,254,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.