HWY MERRIAM ST over RR MBTA/BMRR
0.48 KM S RT 117 · County 017, Massachusetts · Built 1928 · 2 Lanes · 2,716 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.395756, -71.302294
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 98 years old.
Nearby Bridges
HWY ACCESS RD over WATER STONY BROOK
Built 2013
HWY CONCORD RD over OTHER CENTRAL RAIL TRAIL
Built 1911
HWY CHURCH ST over OTHER CENTRAL RAIL TRAIL
Built 1911
HWY WINTER ST over I 95 /ST128
Built 2011
ST117 MAIN ST over I 95 /ST128
Built 1962
US 20 WB/WESTON ST over I 95 /ST128
Built 1960
US 20 WB over RR MBTA/BMRR
Built 1960
US 20 EB over RR MBTA/BMRR
Built 1950
US 20 EB/WESTON ST over I 95 /ST128
Built 1960
I 95 /ST128 over RR MBTA/BMRR
Built 1950
Bridge Details
- Structure #
- W290012NMDOT634
- Year Built
- 1928
- Reconstructed
- 1980
- Length
- 22.3 m (73.2 ft)
- Max Span
- 8.8 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,716
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,464,000
- Total Project Cost
- $2,197,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.