HWY CHURCH ST over OTHER CENTRAL RAIL TRAIL

.32 KM NELY CONANT RD · County 017, Massachusetts · Built 1911 · 2 Lanes · 7,758 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W290032NNDOT634
Year Built
1911
Length
22.9 m (75.1 ft)
Max Span
11 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
7,758
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,957,000
Total Project Cost
$2,936,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.