HWY ASH ST over WATER WESTON RESERVOIR

.9 MI N OF I 90 · County 017, Massachusetts · Built 1902 · 2 Lanes · 1,810 vehicles/day

Overall
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
W290234D4DOTNBI
Year Built
1902
Length
7.6 m (24.9 ft)
Max Span
7.6 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,810
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$599,000
Total Project Cost
$899,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.