I 90 EB over HWY WELLESLEY ST

2.5 MI W. ST 128&I 95 L39 · County 017, Massachusetts · Built 1957 · 3 Lanes · 55,702 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
W290424Q3DOTNBI
Year Built
1957
Reconstructed
1991
Length
19.8 m (65 ft)
Max Span
18 m
Width
18.4 m (60.4 ft)
Lanes
3
Daily Traffic
55,702
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,390,000
Total Project Cost
$3,586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.