I 90 EB over HWY WELLESLEY ST
2.5 MI W. ST 128&I 95 L39 · County 017, Massachusetts · Built 1957 · 3 Lanes · 55,702 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.335378, -71.306789
This bridge is in worse condition than 25.6% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
I 90 WB over HWY WELLESLEY ST
Built 1957
I 90 over OTHER AQDCT AT WLLSLY ST
Built 1957
HWY WINTER ST over I 90
Built 1957
I 90 MAINT RAMP over I 90
Built 1967
HWY OAK ST over I 90
Built 1957
I 90 over WATER AQDCT AT SHAYLR LN
Built 1957
HWY ASH ST over WATER WESTON RESERVOIR
Built 1902
I 90 WB over HWY INDIAN ROCK ROAD
Built 1957
I 90 EB over HWY INDIAN ROCK ROAD
Built 1957
I 90 EB over HWY RIDGEWAY RD
Built 1957
Bridge Details
- Structure #
- W290424Q3DOTNBI
- Year Built
- 1957
- Reconstructed
- 1991
- Length
- 19.8 m (65 ft)
- Max Span
- 18 m
- Width
- 18.4 m (60.4 ft)
- Lanes
- 3
- Daily Traffic
- 55,702
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,390,000
- Total Project Cost
- $3,586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.