HWY OAK ST over I 90

I-90 MM 122 · County 017, Massachusetts · Built 1957 · 2 Lanes · 3,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W290434Q5DOTNBI
Year Built
1957
Length
62.8 m (206 ft)
Max Span
20.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
3,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,154,000
Total Project Cost
$7,732,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.