I 90 RAMP R over OTHER MWRA AQUEDUCT

I-90 WB EXIT 15A RAMP · County 017, Massachusetts · Built 2017 · 2 Lanes · 7,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
W29071BTDDOTNBI
Year Built
2017
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
7,800
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.