I 95 /ST128 over RR MBTA/BMRR

.32 KM SLY RTS 20 & 128 · County 017, Massachusetts · Built 1950 · 9 Lanes · 178,839 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W040262F2DOTNBI
Year Built
1950
Reconstructed
1962
Length
69.2 m (227 ft)
Max Span
24.7 m
Width
45.5 m (149.3 ft)
Lanes
9
Daily Traffic
178,839
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,678,000
Total Project Cost
$31,018,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.