US 20 WB/WESTON ST over I 95 /ST128

RT 20 WB AT RT 128 · County 017, Massachusetts · Built 1960 · 2 Lanes · 29,822 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W040322E3DOTNBI
Year Built
1960
Length
74.7 m (245.1 ft)
Max Span
26.2 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
29,822
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,866,000
Total Project Cost
$10,300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.