HWY PROSPECT ST over WATER CHARLES RIVER
.6 MI. S. MAIN ST. · County 017, Massachusetts · Built 1888 · 3 Lanes · 31,500 vehicles/day
Overall
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.3689, -71.243828
This bridge is in worse condition than 25.6% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 138 years old.
Nearby Bridges
HWY MOODY ST over WATER CHARLES RIVER
Built 1917
HWY WOERD AVE over WATER CHARLES RIVER
Built 2021
HWY ELM ST over WATER CHARLES RIVER
Built 1850
HWY JACKSON ST over RR MBTA/BMRR
Built 1934
HWY NEWTON ST over WATER CHARLES RIVER
Built 1877
HWY RIVER ST over WATER BEAVER BROOK
Built 1984
HWY NEWTON ST over RR MBTA/BMRR
Built 1930
HWY LYMAN ST over WATER LYMAN POND CREEK
Built 1999
US 20 MAIN ST over RR MBTA/BMRR
Built 1936
ST117 MAIN ST over I 95 /ST128
Built 1962
Bridge Details
- Structure #
- W040052CBMUNNBI
- Year Built
- 1888
- Reconstructed
- 1975
- Length
- 40.2 m (131.9 ft)
- Max Span
- 14 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 3
- Daily Traffic
- 31,500
- Material
- Masonry
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,281,000
- Total Project Cost
- $6,422,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.