HWY ELM ST over WATER CHARLES RIVER

400 FT SO INT ELM & RIVER · County 017, Massachusetts · Built 1850 · 2 Lanes · 6,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W040032C9MUNNBI
Year Built
1850
Reconstructed
1949
Length
71.9 m (235.9 ft)
Max Span
20.4 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
6,800
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$5,703,000
Total Project Cost
$8,555,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.