HWY JACKSON ST over RR MBTA/BMRR

0.16 KM S CENTRAL ST · County 017, Massachusetts · Built 1934 · 2 Lanes · 2,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
W040112NKDOT634
Year Built
1934
Reconstructed
1989
Length
11.3 m (37.1 ft)
Max Span
9 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
2,300
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$818,000
Total Project Cost
$1,228,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.