ST117 MAIN ST over I 95 /ST128
0.5 MI NLY RT 20 · County 017, Massachusetts · Built 1962 · 4 Lanes · 18,600 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 3 | Serious |
Location
42.376703, -71.266544
This bridge is in worse condition than 97.4% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 64 years old.
Nearby Bridges
US 20 WB/WESTON ST over I 95 /ST128
Built 1960
US 20 EB/WESTON ST over I 95 /ST128
Built 1960
US 20 WB over RR MBTA/BMRR
Built 1960
US 20 EB over RR MBTA/BMRR
Built 1950
I 95 /ST128 over RR MBTA/BMRR
Built 1950
HWY ACCESS RD over WATER STONY BROOK
Built 2013
I 95 /ST128 over WATER STONY BROOK
Built 1950
HWY PROSPECT ST over WATER CHARLES RIVER
Built 1888
HWY CHURCH ST over OTHER CENTRAL RAIL TRAIL
Built 1911
HWY WINTER ST over I 95 /ST128
Built 2011
Bridge Details
- Structure #
- W040282K3DOTNBI
- Year Built
- 1962
- Length
- 66.4 m (217.8 ft)
- Max Span
- 22.9 m
- Width
- 18.5 m (60.7 ft)
- Lanes
- 4
- Daily Traffic
- 18,600
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $17,330,000
- Total Project Cost
- $25,996,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.