HWY WINTER ST over I 95 /ST128
.4 KM S OF 128 INT · County 017, Massachusetts · Built 2011 · 7 Lanes · 40,700 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.397342, -71.261297
This bridge is in worse condition than 25.6% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 15 years old.
Nearby Bridges
HWY TRAPELO RD over I 95 /ST128
Built 1960
ST117 MAIN ST over I 95 /ST128
Built 1962
HWY ACCESS RD over WATER STONY BROOK
Built 2013
US 20 WB/WESTON ST over I 95 /ST128
Built 1960
HWY LYMAN ST over WATER LYMAN POND CREEK
Built 1999
HWY SPRING ST over ST 2
Built 1967
US 20 EB/WESTON ST over I 95 /ST128
Built 1960
US 20 WB over RR MBTA/BMRR
Built 1960
US 20 EB over RR MBTA/BMRR
Built 1950
HWY MERRIAM ST over RR MBTA/BMRR
Built 1928
Bridge Details
- Structure #
- W040256G1DOTNBI
- Year Built
- 2011
- Length
- 83.7 m (274.6 ft)
- Max Span
- 24.4 m
- Width
- 30.7 m (100.7 ft)
- Lanes
- 7
- Daily Traffic
- 40,700
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,638,000
- Total Project Cost
- $12,958,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.