US 20 EB over RR MBTA/BMRR

O · County 017, Massachusetts · Built 1950 · 2 Lanes · 22,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W290112E6DOTNBI
Year Built
1950
Reconstructed
1960
Length
42.7 m (140.1 ft)
Max Span
19.5 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
22,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,099,000
Total Project Cost
$4,649,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.