HWY BRYTN PNT RD over I 195

1.3MI W OF FALL RIVER C.L · County 005, Massachusetts · Built 1960 · 2 Lanes · 2,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
S160093Y9DOTNBI
Year Built
1960
Length
110.6 m (362.9 ft)
Max Span
30.2 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
2,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,999,000
Total Project Cost
$11,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.