US 6 GAR HWY over WATER LEES RIVER

AT SWANSEA T.L. · County 005, Massachusetts · Built 1970 · 4 Lanes · 17,214 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S160073N4DOTNBI
Year Built
1970
Length
7.9 m (25.9 ft)
Max Span
7.9 m
Width
18.6 m (61 ft)
Lanes
4
Daily Traffic
17,214
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$967,000
Total Project Cost
$1,451,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.