I 195 WB over WATER LEES RIVER

OVER LEES RIVER · County 005, Massachusetts · Built 1960 · 4 Lanes · 38,480 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S160123U6DOTNBI
Year Built
1960
Length
41.5 m (136.2 ft)
Max Span
38.1 m
Width
18.3 m (60 ft)
Lanes
4
Daily Traffic
38,480
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,507,000
Total Project Cost
$12,761,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.