ST103 WILBUR AVE over I 195
.4 MI FROM SWANSEA T.L. · County 005, Massachusetts · Built 1960 · 2 Lanes · 27,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
41.725972, -71.185889
This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 66 years old.
Nearby Bridges
HWY LEES RIV AVE over I 195
Built 1960
ST103 WILBUR AVE over WATER LEES RIVER
Built 2009
I 195 EB over WATER LEES RIVER
Built 1960
I 195 WB over WATER LEES RIVER
Built 1960
HWY BRYTN PNT RD over I 195
Built 1960
HWY GARDNRS NECK over I 195
Built 1960
US 6 GAR HWY over WATER LEES RIVER
Built 1970
I 195 WB over WATER COLE RIVER
Built 1960
I 195 EB over WATER COLE RIVER
Built 1960
US 6 over ST138 RIVERSIDE AVE
Built 2011
Bridge Details
- Structure #
- S160103PDDOTNBI
- Year Built
- 1960
- Length
- 135 m (442.9 ft)
- Max Span
- 37.8 m
- Width
- 17.2 m (56.4 ft)
- Lanes
- 2
- Daily Traffic
- 27,200
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $15,187,000
- Total Project Cost
- $22,781,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.