HWY LEES RIV AVE over I 195

.1 MI N OF ST 103 · County 005, Massachusetts · Built 1960 · 2 Lanes · 7,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S160113YADOTNBI
Year Built
1960
Length
86.3 m (283.1 ft)
Max Span
22.8 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
7,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,348,000
Total Project Cost
$12,523,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.