ST 79 NB over RR SOUTHERN U-TURN

.5 MI. N. OF I 195 · County 005, Massachusetts · Built 2024 · 2 Lanes · 34,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
F02087CFQDOTNBI
Year Built
2024
Length
38.8 m (127.3 ft)
Max Span
17.9 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
34,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.