HWY RAMP G over COMB CENTRAL ST & MACRR

I 195 WB TO 79 NB · County 005, Massachusetts · Built 2016 · 1 Lanes · 7,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F02104BHCDOTNBI
Year Built
2016
Length
210.3 m (690 ft)
Max Span
45.7 m
Width
7.8 m (25.6 ft)
Lanes
1
Daily Traffic
7,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,946,000
Total Project Cost
$5,920,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.